The arrows in green show nearby building frontages, this obviously determines where the start of the bridge will take place on james street mall. The red line is the adjusted path of the bridge, with the ramp spilling fairly deeply into james street mall. The linearity within the mall section will be adjusted later as a sculptural quality.
It's a fairly accurate schematic drawing of the length of the bridge, the kink is there to add to the idea of the force of the beaufort street traffic, as I've stated earlier.
The bridge will still end on the second storey of new sarugaku.